Gazprom - Russia
Audit of the loss record of this giant gas transportation company in Russia
as part of the insurance programme.
Georgian Refinery
A risk study was carried out at the main refinery in Georgia. This study
involved inspection of a 'mothballed' plant with recommendations for future
reinstatement. A valuation was carried out in 1996.
German Oil Storage & Distribution
Co.
Suregrove have carried out surveys at fourteen of their sixty two locations
in S. America, Far East, Germany, Holland, Belgium, Finland, Malta and
the USA.
Greek Refineries No. 1 &
2
For a period of four years we have carried out risk reviews for International
insurers of the largest conversion refinery in Greece. A detailed asset
evaluation was carried out in 1996. This document involved an item listing
of each plant, costing down to US$ 1,000,000 and was produced in two 500
page volumes. Following the acquisition of a second refinery in Thessaloniki
in 1999, this exercise was repeated for the two properties and the marketing
companies downstream.
Greek Refinery No. 2
A full Risk Survey of a refinery owned by the Latsis Group was carried
out in September 1998.
Indian Refinery
A full Risk Survey of a refinery in Madras was carried out in mid-2000.
Indonesian Ethylene Plant
Risk Survey of the largest naphtha cracking plant in the world.
Jamaica Refinery
Four renewal surveys for international insurers at this medium sized refining
company in the Caribbean.
Kazakhstan Pipeline
Risk evaluation of one of the largest pipeline networks in the world spanning
some 7000 Km through out the country. The assets are valued at over US$
2 billion.
Kazakhstan Pipelines
Engineering review of a main gas pipeline facilities in the Ukraine.
Kazakhstan Refinery
A risk engineering survey and valuation was carried out of the Atyrau
Refinery in December 1998.
Khabarovsk Refinery
A risk engineering survey and valuation was carried out of the Sidanco
Khabarovsk Refinery in Far-East Russia during 1998.
Komi Republic
Technical and Financial Appraisal of five onshore oil fields in Komi.
This included a full economic feasibility study of operating and fixed
costs versus CIS sales and foreign export. Interpretation of well production
profiles from all five deposits. This document will be used for obtaining
investment for the development from western companies.
Kuwait Oil Company
Consultancy for Kuwait Oil Company following the Gulf War and during their
Reconstruction programme.
Latvia Gas Storage
Risk survey of an underground gas storage complex plus LPG reception facilities.
Latvia Oil Storage
Risk survey of key coastal export facility.
Latvian Ammonia Plant
Risk Engineering Study of a large ammonia storage plant in Latvia.
Libyan Petrochemicals
An evaluation and assessment project for insurers at a major location
involved in production, Polyethylene, Vinyl Chloride, PVC and other derivatives.
Lithuania Oil Refinery
Located in the Baltic states in Lithuania this facility, capable of processing
250,000 bpd of Russian crude oil, was evaluated for International Insurers.
Malaysia Ethylene & Polyethylene
Risk survey of the first 'grassroots' petrochemicals complex in Malaysia.
Middle East Ethylene
Hazard and Operability study of an ethylene storage and pipeline system
for an ethylene plant.
Middle East Polyethylene &
Polypropylene
Full risk survey including EML evaluation for a multinational petrochemical
complex in the Middle East.
Middle-East Petrochemicals
Valuation and risk engineering study of a large ethylene, polyethylene
and polypropylene plant. The project included a full earthquake study
in conjunction with a leading specialist from London to evaluate potential
exposure to the operation.
New Zealand Offshore Project
Production Platforms and Terminal - a production facility which supplies
all of New Zealand's gas and LPG from natural resources. Suregrove were
requested to undertake a review of specific aspects of this development
for underwriters. The study included both offshore and onshore plants.
Netherlands Oil Refinery Project
Valuation of a large refinery project, which will be sold and transferred
to a new site. This involved a three month exercise 2000-2001, to estimate
the value for sale, re-installation, and re-commissioning in a new location.
Condition survey, valuation at various stages of removal and relocation.
Nigerian Oil Refinery &
Petrochemicals
Engineering surveys on three refineries and one ethylene complex in Nigeria
and valuation of property in 2002 and 2003 (Port Harcourt, Kaduna, Warri).
Work also on 30 oil storage and distribution terminals, gas distribution,
oil fields and other sister companies. Ongoing 2004.
N. Ireland Oil Storage &
Distribution Co.
Suregrove have carried out a condition survey of a fuel oil terminal for
a major power station. This terminal is to be converted to kerosene service
and a scope of work was required plus cost estimate.
Norwegian Oil Storage &
Distribution Co.
Suregrove have carried out surveys at four of their eighteen locations
in the Far East, Holland, Belgium, and the USA.
Oil and Gas Production
A risk study was carried out at two large developments in Russia (Saratov
and Izhevsk) for the production of oil and gas. Ten major locations were
visited for the Sidanco Company. This study involved inspection of plant
with recommendations for future risk improvement. A valuation was carried
out in 1997.
Orenburg Gas Plant
Engineering review of one of the largest gas processing plants in the
world (March 2001).
|